Road Projects
1400 East Road, 3700 North to 4000 North (3 miles)
Description: The road surface will be milled with a new hot mix asphalt overlay.
Restrictions: The road will be closed to thru traffic during construction with a detour. During the construction phase, local traffic and services (mail, garbage, and emergency services) will be provided access. During the paving phase the road will be closed to thru traffic and services.
Tentative Construction Schedule: April 28, 2025 – May 1, 2025
Tentative Paving Schedule: May 5, 2025 – May 8, 2025
3300 North Road, 800 East to 900 East (1 mile)
Description: The asphalt millings from the 1400 East Road project will pave the one mile of dirt road.
Restrictions: This road will be closed to thru traffic and services with a detour.
Tentative Schedule: April 28, 2025 – April 29, 2025
Chip Seal Schedule: June 2025
1300 East Road, 3500 North to 3400 North (1 mile)
Description: The asphalt millings from the 1400 East Road project will pave the one mile of dirt road.
Restrictions: This road will be closed to thru traffic and services with a detour.
Tentative Schedule: April 29, 2025 – April 30, 2025
Chip Seal Schedule: June 2025
700 East Road, 3700 North to 3800 North (1mile)
Description: The asphalt millings from the 1400 East Road project will pave the one mile of dirt road.
Restrictions: This road will be closed to thru traffic and services.
Tentative Schedule: April 30, 2025 – May 1, 2025
Chip Seal Schedule: June 2025
4100 North Road, 1730 East to 2100 East (Key No. 20518)
Description: This project is to rehabilitate and widen 4100 North Road from 1730 East in the Buhl Highway District to 2100 East Road in the Filer Highway District. The project will include recycling the existing Cement Recycle Asphalt Base (CRAB) and utilizing the material to build the new widened base of the roadway section. The roadway will receive a new hot mix asphalt overlay and new striping. This project is being companioned with Filer Highway District’s project KN 19672 from 2100 East to 2400 East. The two projects will complete the 6.65-mile rehabilitation of 4100 North Road.
Restrictions: To be determined as the project develops
Tentative Schedule: Summer 2025
4300 North Road, 1400 East to 1500 East (1 mile)
Description: The road surface will be milled to level and changed for width and grade. It will then be paved with a cold-mix asphalt surface.
Restrictions: The road will be closed to thru traffic during construction with a detour. During the construction phase, local traffic and services (mail, garbage, and emergency services) will be provided access. During the paving phase the road will be closed to thru traffic and services.
Tentative Construction Schedule: May 12, 2025 – May 13, 2025
Tentative Paving Schedule: May 27, 2025 – May 29, 2025
Chip Seal Schedule: June 2025
4600 North Road, Highway 30 to 900 East (1mile)
Description: The road will be widened and will be paved with a cold mix asphalt surface.
Restrictions: This road will be closed to thru traffic and services with a detour.
Tentative Schedule: June 16, 2025 – June 19, 2025
Chip Seal Schedule: August 2025
900 East Road, 4600 North to 4300 North (3 miles)
Description: The road will be widened and will be paved with a cold mix asphalt surface.
Restrictions: The road will be closed to thru traffic during construction with a detour. However, local traffic and services (mail, garbage, and emergency services) will be provided access.
Tentative Schedule: June 30, 2025 – July 8, 2025
Chip Seal Schedule: August 2025
3700 North Road, 1850 East to 1600 East (2.5 miles)
Description: In the planning stages, will update when more information is available.
Restrictions: To be determined as the project develops
Tentative Schedule: Summer 2026
Bridge Projects
The following bridge projects are being funded by the Leading Idaho Local Bridge Program
1050 East Between 3300 N and 3200 North, Bridge over High Line Canal
Description: Total Bridge Replacement
Restrictions: The road will be closed to thru traffic during construction with a detour.
Tentative Schedule: Winter 2025
1400 East 3400 North, Bridge over High Line Canal
Description: Total Bridge Replacement
Restrictions: To be determined as the project develops
Tentative Schedule: Winter 2026
1500 East Between 3900 North and 4000 North, Bridge over Low Line Canal
Description: Total Bridge Replacement
Restrictions: To be determined as the project develops
Tentative Schedule: Winter 2026